To improve the recyclable waste management system and enhance the recycling of resources, the EPA co...
0 111 2022 Project on Recyclable waste management and Recycling
  The Environmental Protection Department of the Executive Yuan, in order to improve the efficiency ...
0 111 111 Year Cleaning Team Environmental Protection Facilities (equipment) Management Integration and Working Environment Improvement Plan
This project focuses on the stabilization technology of lithium battery recycling and disposal as th...
0 111 Battery stabilization and green recycling technology to import the development of new energy fuel cell bipolar plate materials
The main objectives of this program are to collect international primary products management relate...
0 111 The Reduction Planning and Promoting Project for Single-use Plastic products 2022
In order to expedite resource recovery channels and improve the efficiency of resource recovery and ...
0 111 2022 Resource Recycling Project Taipei City
Promote the integration strategy of environmental protection permits, and integrate the four permits...
0 111 111 years Penghu County promoted the integration plan of environmental protection permits
0 111 Intelligent Image Interpretation System Performance Optimization and Application Verification Project - Taking Waste Electronic Appliances and Information Items Subsidized Organizations as an Example
In order to properly recycle end-of-life electric vehicles, this project collects foreign recycling ...
0 111 The impact of the development of electric vehicles on the recycling system and the improving the treatment efficiency of ASR
This project contained four goals, namely enhancing artificial intelligence (AI)-based recognition s...
0 111 2022 Project of AI-based Waste Vehicle Recycling Management System
The objectives of this project include: (1) to research and analyze the management policies of waste...
0 111 International Transboundary Movements of Waste Policy Adjustment and Response Measures Analysis Project
In response to the transformation of energy development, Taiwan is dedicated to the green energy dev...
0 111 romotion Project to Audit the Waste Photovoltaic Panels Disposal and to Recycle Emerging Wastes
Our country is faced with problems such as insufficient natural resources and lack of waste disposal...
0 111 Review and Analysis Plan of the Legal System for Promoting Resource Recycling
The core of this project was to implement the promotion and management of industrial waste recycling...
0 111 Refining the Management of Industrial Waste Recycl ing and Strengthening Flow Tracking Project
To promote and implement resource recycling, waste reduction and recycling, EPA has summited a major...
0 111 Promotion of Private Participation in Building up Concerned Waste Treatment Project
  The project goal includes the four core objectives as “planning for the promotion and management s...
0 111 Metals and Chemicals recycling and medical waste management project
Industrial waste management is facing the shortage of treatment capacity in our country. The Executi...
0 111 Capability inventory, definition and strengthen management of industrial waste
The work of this project divides into four sections with coordination of relevant administrative mat...
0 111 Construction Waste Management and Resource Recycling Project
In order to respond to international management trends, and to reduce plastic waste and resource con...
0 111 The Promotion of Plastic Circulation and Recycled Materials Project
The main implementation approaches in this project were surveys and site surveys to assist the E...
0 111 Agricultural waste disposal and management project(2022)
Continuing the results of last year's project, this project was committed to the development of recy...
0 111 The service of product verification operation management and audit counseling
In response to the increasing complexity of the pollution caused by manufacturing process and the cl...
0 111 Project of Year 2022 for promoting the integration of environmental protection permits of Kaohsiung City
The residue of the abandoned vehicle after a pulverization process and recycling treatment is called...
0 111 Technology Development of ASR Volume Reduction in Co-processing in Cement Kiln
This project which included analysis of license management system, policy improvement, draft regulat...
0 111 Project of Management for Waste Clearance and Disposal organization
The project goal contains five core objectives as “enhancement of the Environmental Management Syste...
0 111 The Industrial Waste Management Information System Maintenance and Application Project of 2022
Due to the immature material sorting technology, the used clothes are mainly sorted manually, which ...
0 111 Development of quantitative identification technology and operation module for recycling discarded textiles and its verification
The 10 main undertakings of this project are: "Handle the Performance Assessment of the EPA’s Promot...
0 111 2022 General Recycling Program for Taoyuan City
Owing to the advantages of intrinsic properties of plastics such as low cost and durability, human b...
0 111 Manufacturing High-Valued Multi-Walled Carbon Nanotubes by Valorizing Recycled Plastic Wastes
0 111 111 Annual Improvement of General Waste Sampling Methods and Promotion of the Project Work Plan for the Optimization of Fixed-point Collection of Waste
The project conceived by the concept of the “Circular Economy”, which aimed to deepen international ...
0 111 The Project of International Network Connection and Collaboration for Circular Economy
0 111 Project to Promote Environmentally Friendly Design on Campus, Select Enterprises with Excellent Recycling Performance, and Conduct a Special Exhibition
The negative impact of climate change has attracted the attention of the international community and...
0 111 The Project of the Resource Recycling Policy Planning and the Material Flow Management
The project tasks this year include planning and designing the qualification requirements and system...
0 111 Project on Management of Audit and Certification and Supervision on Audit Practices
In order to promote the application management and promotion of inorganic recycled materials, this p...
0 111 Project of application management and promotion for inorganic recycled materials in onshore engineering
The properties of inorganic recycled aggregate are similar to natural sand and gravel, a good altern...
0 111 Application and promotion of inorganic recycled aggregate in the harbor area
In view of the possible blaze or explosion risks of abandoned lithium batteries during the recycling...
0 111 Development of a fire and explosion risk prevention mechanism for waste lithium battery storage and processing operations.
In response to the 2050 Net-zero emission goal and the circular economy policy, this project aims to...
0 111 Evaluation and Analysis Project of Establishing Repairability Index for Electrical and Electronics Products
In order to strengthen and implement the management of varied kinds of industrial waste, the EPA of ...
0 111 The 2022-2023 Project to Review Both the Industrial Waste Flow Reporting Controls and the Related Inspection (1st year)
Project name: Miaoli County handles the 111 year subsidy plan for promoting waste reduction and recy...
0 111 Miaoli County - 111 year to promote waste reduction and recycling subsidy plan
0 111 Kinmen County_111 annual subsidy for municipal and county (city) environmental protection agencies to handle resource recycling work plans
(1) Handling the inspection of restricted-use objects of single-use beverage cups (2) Promote the so...
0 111 (111 ) Kinmen County handled the subsidy plan for promoting waste reduction and recycling
In order to achieve the purpose of formulating the industrial waste disposal plan (IWDP) for waste g...
0 111 Project for Industrial Waste Disposal Plans, Waste Source Management, and Resource Recycling
To enhance the general waste management capability, the 2022 General Waste Management Information Sy...
0 111 2022 General Waste Management Information System Upgrade Project
The project included five major work items, the following de-scribed each parts results of the work....
0 111 The Industrial Waste Disposal Management and Fuelization Promotion Project in 2022
The implementation period of this project was from February 21st, 2022 to December 10th, 2022. The r...
0 111 Project of promoting the renewal of low-carbon refuse trucks and optimization for clearance, 2022
In respond to the transformation of energy development, Taiwan is dedicated to enhancing the ...
0 111 Work Plan for Recycling and Disposal of Waste Photovoltaic Panels
0 111 Demonstration of Energy Saving and Emission Reduction for Asphalt Pavements through Temperature Reduction on Trials in Mixing Plant and Paving Site
This project contains six aspects, including refining the functions of the Waste Dumping Management ...
0 111 2022 Improving the tracking efficiency of waste disposal sites and monitoring technology application plan
Due to the continuing promotion of the resource recycling policy by the Environmental Protection Adm...
0 110 Project on the Management of General Waste Recycling
0 110 Research project of eight counties without operating waste incinerators (Nantou, Yunlin, Hsinchu, outlying islands, and Huadong) promote advanced municipal waste processing technology
0 110 Project of Auditing & Certification Group on Regulated Recyclable Waste(Waste Electronic and Electric Appliances (EA)& Information Technology (IT) Equipments)
The project period was from January 1, 2021 to December 31, 2022. The main objectives of the project...
0 110 The Inspection and Certification Third Party on Due Recycled Waste(waste batteries and waste lamps)
The project period was from January 1st, 2021, to December 31st, 2022, whereas below data was collec...
0 110 Project of Auditing & Certification Group on Regulated Recyclable Waste (Plastic Waste Containers)
This project conducted from January 1, 2021 to December 31, 2022. It is a two-year project and has c...
0 110 Project of Auditing and Certification Group on Regulated Recyclable Waste (Waste Tires)
(1) Handle various publicity activities on waste reduction at source 1. This plan has been submitted...
0 110 110 Hualien County handles the subsidy plan to promote waste reduction and recycling
The performed results of the Project conducted by FTIS during the project period, January 01, 2021 t...
0 110 The auditing and certification project of the regulated recyclable waste (Waste Vehicles)
For the auditing and certification of waste lead batteries recycling facilities, the main tasks incl...
0 110 The Auditing and Certification Project of the Regulated Recyclable Waste (Waste Lead batteries)
The implementation period of this project is from January 1, 2010 to December 31, 2011. The content ...
0 110 The auditing and certification project of the regulated recyclable waste(Waste vehicles)
Promote the application and change (change) of environmental protection permit documents for air, wa...
0 110 110 years to promote the integration plan of environmental protection permits
110 Nantou County Water Pollution Source Inspection, Control and Animal Husbandry Recycling Guidance...
0 110 110 Nantou County Environmental Permit Integration Promotion Project
To promote “entire garbage classification and zero waste” project, the city carries out the implemen...
0 110 2021 Promotion of Garbage Reduction and Recycling Plan in Taoyuan City 110
The county's coastline has a total length of 42.6 kilometers (the cleaning length is about 35 kilome...
0 110 Salute to the Sea in 110 Years - Coastal Cleaning and Maintenance Program - Chiayi County
First, use the air quality purification areas, ecological parks, greening and beautifying small park...
0 110 110-year non-agricultural land environmental weed management plan__Chiayi County
The Municipal Waste Disposal Scheme (MWDS) was established in 1973, with burial as the main disposal...
0 110 2021 New-Taipei City Waste Reduction, Recycling and Subsidy Program
The execution period of "Resource Recycling Work Plan of Pingtung County in 2021” is from January 1 ...
0 110 Resource Recycling Work Plan of Pingtung County in 2021
The execution period of “The Action Project Plan on Promotion of Resource Recovery of Pingtung Count...
0 110 The Action Project Plan on Promotion of Resource Recycling of Pingtung County in 2021
0 110 Lubricating Oil Production and its Recycling and Treatment System Supervision and Management, with Promotion of High value Utilization
In order to solve the problem of gradually reducing volume of the original landfill, but still need ...
0 110 Public landfill operation supervision and inspection commissioned project. (2021-2022)
0 110 Project to Formulate the Disposal Mechanism for the Buildings Construction Waste Containing Asbestos and to Promote the Relative Work Plan
Due to rapid economic development, resources will be exhausted and pollutants continuously discharge...
0 110 The Promotion of Biomass Circulation Project
0 110 The 2021 and 2022 Guidance Project on the Reporting of Recycling Operating Volume for the Responsible Enterprises of the Recycling Management Fund
0 110 The Project of High-Value Recycling and Applications, Promoting Certification Management Efficiency to Recycling Institution for Tire and Lead-Acid Battery
(1) Survey on objects of use of plastic bags for office purchases and disposable plastic straws (2) ...
0 110 (110 ) Kinmen County handled the subsidy plan for promoting waste reduction and recycling
(1) Handling the management and counseling of the recycling industry 1. Has assisted and handled the...
0 110 110 Kinmen County Promotes General Waste Resource Recycling Management Guidance and Audit Control Plan Audit
0 110 Advancement Project on the Application Review and Management of Recycling and Disposal Enterprises and Subsidized Organizations (2021 & 2022)
0 110 Project on providing guidance and auditing of the verified operating volume or import volume of designated responsible enterprises with small fee payments (Year 2021 and 2022)
The purpose of this project is to effectively improve Changhua County's execution performance in res...
0 110 2021 Changhua Recycling Comprehensive Management Plan
In order to expedite resource recovery channels and improve the efficiency of resource recovery and ...
0 110 2021 Resource Recycling Project Taipei City
In the 1960s and 1970s in the middle and lower reaches of the Erren River Basin, illegal metal smelt...
0 110 Errenxi Waste Removal and Treatment Plan for Temporary Waste Storage Site in Tainan City
The implementation period of this plan is from February 24, 2021 to December 20, 2021. It mainly imp...
0 110 2021 Resource Recycling Advocacy and Inspection Control Plan
0 110 Project on Project on Project on Project on Project on Project on Project on Project on Project on Project on Project on the assessment and plan for encouraging private the assessment and plan for en
For improvement of the efficiency of recycling of kitchen waste by composting facilities and biomass...
0 110 Performance Upgrade of Kitchen Waste Composting Plant and Diversified Biomass Energy Promotion Plan
The project is aimed at assisting the Environmental Protection Agency (hereafter referred to as the ...
0 110 Work Plan for Minimizing Packaging Waste and Heavy Metal Project (2021)
To adapt to the impact of urgency of reducing the amount of disposable plastic products , this proje...
0 110 The World Café on Plastic Restriction Issue
Establish the Maintenance Program of Mechanical and Electrical Equipment for the Incineration Plant ...
0 110 Establish the Maintenance Program of the Mechanical and Electrical Equipment for the Incineration Plant
In order to increase the recycling rate of scrap cars, this project has proposed subsidy to promote ...
0 110 Management Improvement for the Recycling and Treatment System of ELV Project 2021
A summary of the main work items in 110, including: 1.Results of landfill supervision (1).Common def...
0 110 110 Annual Public Landfill Monitoring and Supervision Management Plan
Internet Promotional Activities of Recycling...
0 110 Internet Promotional Activities of Recycling
0 110 Yilan County's 110 Annual Resource Recycling Project Operation Audit Tracking Control, Publicity Work and Promotion of Waste Reduction and Recycling Program
The Environmental Protection Bureau of Taichung City Government for specific objects exempts and red...
0 110 110 Taichung City General Waste Removal and Treatment Fee Collection Operation Commission Plan
The main objective of this project was to strengthen supervision over various types of announcement ...
0 110 110 Taichung City Implementation of the Registered Responsible Business Volume Inspection Project Plan
This project mainly conducts quality inspection on the returned incineration regenerated pellets, co...
0 110 110 General waste disposal and supervision management plan
In order to improve the waste spring mattress inventory and related policy planning of this project,...
0 110 Evaluation and planning for waste spring mattresses recycling and disposal
In order to promote the "Diversified Waste Management Plan 2.0" in the new era and the construction ...
0 110 Project of accessing the construction of diversified treatment and overall strategy for the municipal solid waste
The purpose of this project is to understand the efficiency of treatment plants for municipal solid ...
0 110 Improvements in the Efficiency of Treatment Facilities for Municipal Solid Wastes (MSW)
The execution period of this project lasts for about 11 months, from February 20th, 2021 to Decembe...
0 110 2021 Annual Project for Exhibition of Resource Recycling Achievements and Promotion of Executive Agencies' Resource Recycling
This project studies and analyzes the container goods market, collecting and compiling opinions from...
0 110 The Container Goods Environmental Planning and Design and Recycling Market Research and Analysis Project
The main aims of this project, which commenced on May 6th 2021 and is to be completed on December 30...
0 110 The Reduction Planning and Promoting Project for Single-use Plastic products 2021
In order to improve the effectiveness of waste reduction, the Taichung City Government Environmental...
0 110 110Annual Taichung City reduction、 recycle、reuse of second-hand resources plan
Environmental cleaning vehicles shoulder the major responsibility of maintaining environmental clean...
0 110 Project management planning of artificial intelligence, self driving environmental cleaning and transportation vehicle
This project contained four goals, namely introducing artificial intelligence (AI) to recognize vehi...
0 110 2021 Project on Establishing An AI-based Waste Vehicle Recycling System
This year, we have completed 12 creative publicity activities combining local festivals and local in...
0 110 110 Tainan City Resource Recycling and Diversified Reuse Promotion Project
The focus of the implementation of this plan is to assist the Environmental Protection Agency in imp...
0 110 110 Tainan City Resource Recovery Work Integration Project
110 Tainan City waste reduction project was launched on 16 March 2021, and ran until 15 November 202...
0 110 110 Tainan City waste reduction project
0 110 Project on strengthening the recycling management system and improving the recycling effectiveness of waste home appliances and IT equipments
Project name: "110 Years Tainan City Resources Review and Counseling Project" Project implementation...
0 110 110 Years Tainan City Resource Recycling Inspection and Coaching Program
The main work items of the project are: “Assisting in Processing Various Industrial Waste-Related Pe...
0 110 2021 Taichung City Industrial Waste Tracking Control and Reduction-Recycle Counseling Plan
The implementation period of this project is from April 26, 2021 to December 31, 2021. Relevant resu...
0 110 The 2021 Project of Promote the Marine Debris Recycling and Recycling Mark Management
This project plans to introduce the concept of IoT to sensor devices, mobile devices and other tools...
0 110 Using IoT with auto-monitoring technology to improve the procedures of audit and certification for waste container recycling
This plan mainly assists in cooperating with the Environmental Protection Agency's waste reduction p...
0 110 Chiayi County Waste Source Reduction and Resource Reuse Work Plan for the Year 110.
The Environmental Protection Bureau of Chiayi County (hereinafter referred to as the Environmental P...
0 110 Garbage Reduction, and Improvement Measures and Promotion Project for Resource Recycle of Chiayi County for Year 2021
This plan mainly checks and assists the Environmental Protection Agency of the Executive Yuan (herei...
0 110 110th Annual Kaohsiung City Operation Volume Checking Counseling Program for Waste Disposal Operators
This Plan is being implemented over the period from March 11, 2021 to December 15, 2021. The main ob...
0 110 Project to Promote with Environmentally Friendly Product Design and Environmental Education Work Plan in 2021
The project period was from Mar 5, 2021 to Dec 15, 2021. The waste batteries collection campaign had...
0 110 The Collection and Recycling Systems Reviewing and Management Improving for Waste Batteries and Waste Lamps
In this project, we used hydrothermal method instead of traditional pyrolysis to transform rigid PU ...
0 110 Converting PU waste by hydrothermal carbonization to value-added carbon materials for environmental application
The promotion of recycled aggregate by the executive authority often faces a lack of communication b...
0 110 The planning for better use of recycled aggregate
The amount of waste LCDs dramatically increases along with their annually increasing usage amount. I...
0 110 Application of LCD Waste Recycling System for High-End Display Production
“Resource Circulation”, stands for the core of this year’s project. As to fulill the new concept of ...
0 110 The Marketing and Education Promotion Project for Circular Economy Source Reduction and Resource Recovery of Waste.
This research cooperated with UWin Nanotech Co., Ltd. to recover, separate and purify lithium and co...
0 110 Development of key materials recycling and pollution control technologies for waste Lithium-Cobalt battery
Most construction and demolition wastes are stable and harmless substances, and these are also main ...
0 110 A project to develop clean management and resource circulation strategies for construction and demolition waste
Each year about 6,000 tonnes of rigid polyurethane (PUR) is disposed of due to the dismantling of wa...
0 110 Glycolysis of waste refrigerator PUR for foam product application
Compared with traditional illumination light sources, LED lighting sources are more environment...
0 110 Technology development for recycling of plastic lampshade from waste LED lighting sources
Most of fire incidents in waste tire recycler had happened in the non-auditing and certification per...
0 110 Develop the system of IoT auto-monitor and verification management to the waste tire recycler
The transboundary movements of waste around the world have become stricter in recent years: (1) The ...
0 110 Industrial waste import and export management and adjustment plan in response to international trends
For the emerging products, designated by Environmental Protection Administration, such as large-size...
0 110 Review the Emerging Product Recycling Project
This project collects domestic and foreign cases of using image recognition to assist waste recyclin...
0 110 Feasibility study for the application of image recognition technology on auditing waste appliances treatment
Refrigerators can be divided into compressor refrigeration and absorption depending on the cooling p...
0 110 Recovery technology of ammonia refrigerant from waste absorption refrigerator
0 110 Project to Establish the Function of Self-Checking Baseline Data of Source Waste & to Promote the Industrial Waste Disposal Plan into Recycling Mechanism
EPA setup the incentive policy to encourage people do the right way for their wasted vehicles. In 1...
0 110 Waste Vehicles Recycle Awards Application Review and approval project.
This project contains six parts, namely improving the functions of the Waste Dumping Management Syst...
0 110 2021 Improving the tracking efficiency of waste disposal sites and monitoring technology application plan
In order to track the use of domestic resources, the plan intends to upgrade the resource cycle anal...
0 110 Project of the Resource Circulation Strategy Improving and Maintenance Project of a Material Flow Management System
In order to respond to international management trends and reduce plastic waste and contaminant, the...
0 110 The Promotion of Plastic Resource Circular Economy Model Project
In order to promote resource sustainability, EPA intends to implement product verification, through ...
0 110 The service of promoting reuse product operation management and quality control
In this study, an effective process was proposed to recover BOFS (Basic oxygen furnace slag) and spe...
0 110 Research plan of industrial by-products of sulfuric acid and calcium recycling
Cause hazardous industrial waste with its own noxious constituents and properties, this project chec...
0 110 Refining the management of hazardous industrial waste
The project accepted a total of 77 cases of application for subsidies, and completed 50 review meeti...
0 110 110 implementation of the agency's resource recovery field project supervision project work plan
This plan follows the 2020 with an evidence-based design to optimize resource recovery vehicles. By ...
0 110 Innovation module for recycling collection vehicle application design validation and advocacy design
The scope of this project includes three major items as to enhance waste recycling management, to gr...
0 110 Promotion of industrial waste recycling management policy project
This project was carried out from February 19th, 2021 to December 15th, 2021. The main results were ...
0 110 Improving General Waste Reduction and Disposal Management Project 2021
The covalent cross-linking of tire rubbers is prerequisite for acquiring high elasticity and environ...
0 110 Waste tires classification, devulcanization and cyclic application for conveyor belt.
In order to promote the environmental standards and application of inorganic recycled materials, thi...
0 110 Project of environmental standard and application for inorganic recycled materials
In order to promote the application management and promotion of inorganic recycled materials, this p...
0 110 Project of application management and promotion for inorganic recycled materials
In response to the increasing complexity of the pollution caused by manufacturing process and the cl...
0 110 Project of Year 2021 for promoting the integration of environmental protection permits of Kaohsinug City
This project which included analysis of current situation and recycled materials, counselling visits...
0 110 Project of Management for Waste Clearance and Disposal organization in 2021
This project mainly focuses on the concept of "Circular Economy", organizing and participating in in...
0 110 The Project of Industry Innovation and International Cooperation for Circular Economy
The "Work Plan for 2021 General Waste Management Information System Upgrade Project" is commissioned...
0 110 2021 General Waste Management Information System Upgrade Project
This project assists the Environmental Protection Agency in conducting surveys and counselling visit...
0 110 Agricultural and medical waste disposal management project
At present, there are the following shortcoming in the inspection of non-conformance events by manua...
0 110 A Test System Plan base on AI Image Recognition for Automatic Audit Certification-Take Waste Electronic Appliances As an Example
110 Taichung City handles general waste source reduction, recycling, responsibility and vendor manag...
0 110 110 Taichung City handles general waste source reduction, recycling, responsibility and vendor management plan
In 2021, this project accomplished numerous tasks, including promoting audit and certification pract...
0 110 2021 Project of Management and Supervision on Audit and Certification of Regulated Recyclable Waste
This plan is to implement the guidance and inspection work of related businesses in various resource...
0 110 110 Tainan City Registered Responsible Operators Business Volume Verification Program
The main work items of the project are: “Executing Control of Wastes”, “Business Wastes Reduction an...
0 110 2021 Taichung City Illegal Dumping Site Disposal and Emergency Response Plan
The project included five major work items, the following described each parts results of the work. ...
0 110 Evaluation on Industrial Waste Disposal and Management, 2021
A.Refuse Incineration Plant Portion In order to ensure the effective supervision of the management o...
0 110 Project for Management and Appraisal Work of Refuse Incineration Plants, Incineration Fly Ash and Bottom Ash
This project contained numerous tasks, namely assisting the Environmental Protection Administration ...
0 110 Maintenance and Application of Industrial Waste Management Information System of 2021
0 110 無英文標題
This project is aimed at innovative research and development technology for waste label processing (...
0 110 Research on Resourciziation and Multiple Applications of Mixed Waste Labels
This project is aimed to reinforcing and materializing the management of varied kinds of industrial ...
0 110 The 2020-2021 Project to Review Both the Industrial Waste Flow Reporting Controls and the Industrial Waste Disposal Plans (2nd year)
This project focus on the study and analysis of the permanent magnet components from waste electrica...
0 110 Rare earth separation and purification technology for waste electrical equipment
The problems of promoting resource recycling in Taiwan mainly lie in production, consumption, waste ...
0 110 Management of Industrial Waste and Evaluation of Strategies for Resource Recycling
In terms of waste container distributing surveys, this project has completed surveys of 150 recyclin...
0 110 Regulated Recyclable Containers of Collection Recycling system management project
To sustain its resource recovery promotion, this plan is therefore formulated to assist Chiayi City ...
0 110 2021 Year Chiayi City’s Resource Recovery Plan
The scope of work for this project includes "Up-grading the Public Toilets", "Environmental Improve-...
0 110 110 years of public toilet upgrade and environmental improvement and waste reduction and recycling work plan
The implementation period of this project was from January 1, 110 to December 10, 110. The results o...
0 110 Project of promoting the renewal of low-carbon refuse trucks and optimization for clearance, 2021
This project generated audit reports on high-risk industries by integrating heterogeneous data and b...
0 110 The 2021 Environmental Audit Project for High-Risk Pollution Industries Using Visual and Artificial Intelligence Analytics
Environmental Protection Bureau Changhua County(CHEPB) will build the Multifunctional Warehouse near...
0 110 Technical service project and environmental Impact difference of Multifunctional Warehouse
This Plan was implemented from June 15 to November 30, 2021 to promote various waste reduction it...
0 110 Waste Reduction and Recycling Subsidization Plan of Pingtung County in 2021
In Taiwan, the waste treatment capacity of the incineration system is insufficient and aged, and som...
0 110 Feasibility evaluation of SRF treatment, recycle and remove of waste plastic container derived waste plastics
This project aims to design a waste collection system that is not only desirable but also feasible i...
0 110 Design for Waste Collection System in Taiwan
This project mainly provides services such as free information, consultation, reporting, the person ...
0 109 0800-085717 toll-free resource recycling service hotline project
本計畫依據環保局訂定之目標及工作內容,執行「宜蘭縣109年度促進垃圾減量回收計畫」,本計畫執行期程自109年2月1日起至109年11月30日止,截至期末報告階段,相關作業均詳實推動與執行,本計畫之執行...
0 109 Yilan County's 109th Annual Promotion of Waste Reduction and Recycling Plan
依據環保局訂定之目標及工作內容,執行「宜蘭縣109年度資源回收專案作業查核追蹤管制及宣導工作計畫」,相關作業均詳實推動與執行,截至期末報告階段,本計畫執行之成果重點說明如下: 一、辦理資源回收巡查工作...
0 109 Yilan County 109 Annual Resource Recovery Project Operation Check Tracking Control and Publicity Work Plan
Internet Promotional Activities of Recycling...
0 109 Internet Promotional Activities of Recycling
Taiwan has implemented recycling for more than 20 years. It not only creates outstanding recycli...
0 109 2020-2021 Recycling Industry Value Analysis and Bilingual Documents Establishment Project
0 109 An examination of manufacturing volume and/or import volumes produced by the designated responsible enterprises for year 2020 and 2021 (the second area)
During the implementation of this project, it completed the investigation of the list from domestic ...
0 109 The Project of Promotion and Management for Industrial Waste Fuelization in 2020
Penghu is a vibrant county comprised of 90 islands, and burial is a common treatment for domestic wa...
0 109 The recycling advocacy project of Penghu county in 2020
The population of Penghu County is growing steadily. The number of tourists visiting each year excee...
0 109 2020 Penghu County Recycling Machine Test Project
Due to its special geographical location, Penghu has become a relay station between Taiwan's main is...
0 109 109 Penghu County Resource Recovery Work Plan Entrusted Professional Services
This project, executed from 25 March 2020 to 31 December 2021, aimed to audit designated enterprises...
0 109 https://epr.epa.gov.tw/wf05_project.aspx?gu=1&t=1&pid=1090505406&recno=1&rn=90458915
The main aims of this project, which was commenced on April 28th 2020 and is to be completed on Febr...
0 109 The Reduction Planning and Promoting Project for Single-use Plastic products 2020.
This plan mainly checks and assists the Environmental Protection Agency of the Executive Yuan (here...
0 109 109th Annual Kaohsiung City Operation Volume Checking Counseling Program for Waste Disposal Operators
The main objective of this project was to strengthen supervision over various types of announcement ...
0 109 Bookkeeping examination of responsible enterprises to the manufacturing /import volume of containers designated (Year 2020 and 2021)
The implementation of this plan is based on the work items and content specified in the contract, an...
0 109 Hsinchu City handles the implementation plan of the source reduction project for large-scale activities in 2021
This project, executed from 15 January 2020 to 30 November 2021, aimed to audit designated enterpris...
0 109 Examination of responsible enterprises to the manufacturing/import volume of containers designated(Year 2020 and 2021)
This plan aims to strengthen the promotion of the use of non-disposable products in night markets an...
0 109 Hsinchu City promotes environmental night market or business district implementation plan in 2020
In respond to the transformation of energy development, Taiwan is dedicated to enhancing the green e...
0 109 Work Plan for Operation of the Recycling and Disposal of Waste Photovoltaic Panels
There are 368 Cleaning Squadrons across the country. They are responsible for environmental cleaning...
0 109 2020-2021 Project of Counseling and Improving Environmental Protection Facilities
In order to clarify the landfilled waste in 16 land serial numbers such as 568, Jia'an Section, Houb...
0 109 Investigation and Monitoring Plan of 16 Land Serial Numbers Such As 0568-0000, Jia'an Section, Houbi District, Tainan City
This plan takes "source reduction and resource recovery" as the direction of garbage disposal. It co...
0 109 Waste Recyling and Reduction Inspection Plan of 2020
This plan aims to strengthen the promotion of the use of non-disposable products in night markets an...
0 109 Environmental night market promotion plan(Recycling equipment)
109 Miaoli County promotes environmental protection night market business district implementation pl...
0 109 109 Miaoli County promotes environmental protection night market business district implementation plan
Design the new garbage removal and transportation optimization and smart resource recovery plan for ...
0 109 Hsinchu City optimizes garbage collection and smart resource recycling plan of 2020
Biodegradable plastics are plastics that can be decomposed by microbes into water, carbon dioxid...
0 109 The Feasibility of Biodegradable Plastic Bags and Containers Decomposed in Commercial Composting System
Paper tableware recycle of cafeteria in Taichung city 2020...
0 109 Paper tableware recycle of cafeteria in Taichung city 2020
This plan project will mainly assist in coordinating with environmental-friendly night market and co...
0 109 Implementation Project for Environmental-friendly Night Market and Commercial District
(1) Handle the inspection of shopping plastic bags and one-time use of plastic straws to restrict th...
0 109 109 "Promotion Plan for the Promotion of Waste Reduction and Recycling Management Measures in Kinmen County"
(1) Promote the reduction of disposable tableware in business circles (2) Promote the reduction of p...
0 109 Promote the implementation plan for one-time product reduction in the Jincheng Town God Temple business district in Kinmen County
Abstract This plan adopts plastic reduction,reuse of tableware, safety,hygiene and preferential trea...
0 109 Night market and Shopping District recycle implement project 2020
The task team executed the "Resource Recycling Work Plan of Pingtung County in 2020." The resource r...
0 109 Resource Recycling Work Plan of Pingtung County in 2020 Abstract
109Annual Chunghua County general waste reduction、 responsibility、trafficking managment plan....
0 109 109Annual Chunghua County general waste reduction、 responsibility、trafficking managment plan.
The task team carried out "The Advanced Project Plan on Scrap Tire Resource Recycling of Pingtung Co...
0 109 The Advanced Project Plan on Scrap Tire Resource Recycling of Pingtung County in 2020
After eating the waste paper tableware, due to residual oil or vegetable residues, if the store does...
0 109 Businesses recycle Single-use paper tableware grants program 2020
0 109 Subsidy Plan for Promotion on One-time Product Reduction of Pingtung County’s Environmental Protection Night Market and Shopping District in 2020
This plan is based on three implementation frameworks of source reduction, resource reuse, and revie...
0 109 Kaohsiung city process decreasing trash and recycling enhancement grants program 2020
The execution period of “The Action Project Plan on Promotion of Resource Recovery of Pingtung Count...
0 109 The Action Project Plan on Promotion of Resource Recycling of Pingtung County in 2020
The task team carried out "The Project Plan on Guidance of Waste Paper Tableware Recycling-Friendly ...
0 109 The Project Plan on Guidance of Waste Paper Tableware Recycling-Friendly Stores of Pingtung County in 2020
Nantou County recycling Project in 2021 focuses on holding recycling activities for 13 sanitation te...
0 109 Nantou County recycling Project in 2021
Plan to Build Fly Ash Washing Plant in Taichung City...
0 109 Plan to Build Fly Ash Washing Plant in Taichung City
The Environmental Protection Bureau of Taichung City Government (hereinafter referred to as the Envi...
0 109 109 Taichung City General Waste Removal and Treatment Fee Collection Operation Commission Plan
The primary execution purpose of the Plan is to supervise and review the normal functioning of relat...
0 109 2020 Taichung City Illegal Dumping Site Disposal and Emergency Response Plan
The main work items of the project are: “Assisting in Processing Various Industrial Waste-Related Pe...
0 109 2020 Taichung City Industrial Waste Tracking Control and Reduction-Recycle Counseling Plan
109Annual Taichung City general waste reduction、 responsibility、trafficking managment plan....
0 109 109Annual Taichung City general waste reduction、 responsibility、trafficking managment plan
0 109 Waste recycling guidance and control , promote and set the village of recycling station in Taichung City.
Over the years, Yunlin County takes agriculture, fishery and animal husbandry as its main industries...
0 109 2020 Regulation of Industrial Waste and Water pollution Abatement Project
This plan takes the EPA's promotion of implementing agencies to strengthen the performance appraisal...
0 109 2020 Annual Resource Recycling System Management and Recycling Industry Image Transformation Plan
In the final report, we have completed 100% of project items in November 5, 2020. Environment Main...
0 109 The project of auditing manufactured/imported volume oresponsible enterprises in Taoyuan in 2020.
The statistics of this project ends on November 20, 2020. The results of various tasks implemented d...
0 109 2020 Taoyuan City Taole Recycling Station & Business Recycling Guidance Program
This project promotes executive agency to strengthen the performance evaluation of resource recyclin...
0 109 2020 General Recycling Program for Taoyuan City
This plan takes the EPA's promotion of implementing agencies to strengthen the implementation of res...
0 109 2020 years to promote the paper tableware recycling friendly store subsidy program
The purpose of this project is to effectively improve Changhua County's execution performance in res...
0 109 Changhua County for Resource Recycling and Image Improving Management Project (2020)
The purpose of this project is to effectively improve Changhua County's execution performance in res...
0 109 Changhua County for Resource Recycling Inspection and Control Project (2020)
Established in October, 1999, Fu-Hua Night Market serves as a local night market for the nearby comm...
0 109 The 2020 eco-friendly night market pilot program
To promote the proper waste paper tableware classification for recycling after meal and the effects ...
0 109 109 Tainan City Paper Tableware Recycling Friendly Store Subsidy Project
More than 95% of the waste lubricating oil is recycled into fuel oil. However, the Environmental Pro...
0 109 Establish a Management for the Collection and Recycling Systems of Waste Lubricating Oil
The purpose of this project was to assess the feasibility of the cement kiln as a resource recycling...
0 109 Project of Assessment of Cement Kilns as Resource Recycling Centers
The implementation plan for promoting environmental protection business circles in Yunlin County for...
0 109 2020 Yunlin County promotes environmental protection business circle implementation plan
A summary of the main work items in 109, including: 1.Environmental monitoring of the use site and t...
0 109 109 Yunlin County Public Landfill Site and Waste Disposal, Supervision and Management Plan
This project aims to promote the domestic chemicals recycle framework and to improve sustainable mat...
0 109 Chemicals Recycling Promotion Plan
The implementation period of this project is from March 5, 2020 to March 31, 2021. Relevant results ...
0 109 Demonstration and Promotion Project for the High-Quality Recycling of Marine Wastes
The Continuation and Distribution Resources Project was conducted by Yunlin County Government on Mar...
0 109 2020 The Continuation and Distribution Resources Project
The project compiled and updated the 2018 Taiwan National Greenhouse Gas Inventory of Waste Sector a...
0 109 Refinement of Greenhouse Gas Emission Statistics and Work Effectiveness Analysis of Waste Sector
This project is to promote high-value technology to industrial recycling and reuse for waste tire an...
0 109 The Project of Promoting High-Value Technology to Industrial Recycling and Reuse for Waste Tire and Lead-Acid Battery
This project conducted from January 1, 2019 to December 31, 2020. It is a two-year project and has c...
0 109 The auditing and certification project of the regulated recyclable waste(Waste vehicle
0 109 Project of ELV Shredding Plants Diagnosis for Improvement and Review the Subsidies for Fine Classification Plants Constructing or Recycling Storage Sites Optimization Plan.
This project collects the problems and financial application of the industrial waste disposal fund a...
0 109 The Establishment and Planning of Industrial Waste Disposal Fund and the Evaluation and Analysis of Management Strategies.
After end-of-life vehicle (ELV) shredding, separating, and recycling the valuable materials by the E...
0 109 Automotive Shredder Residue Separation and Refuse Derived Fuel Production Program
This project assisted the Environmental Protection Administration (EPA) in planning a new cloud audi...
0 109 2020 Implementation Project for Waste Vehicle Smart Recycling and Cloud Audit and Certification
0 109 The 2019 and 2020 Guidance Project on the Reporting of Recycling Operating Volume for the Responsible Enterprises of the Recycling Management Fund
The government has taken action to reduce the environmental problems that result from improper handl...
0 109 Reviewing the application of incentive on waste vehicles recycle project.
In 2020, this project accomplished several tasks including establishing a mobile audit and certifica...
0 109 2020 Project of Supervision on Audit and Certification Groups
The implementations were summarized as the following, 1. Revise levy and subsidy rate and extended v...
0 109 Classified management of ELV dismantlers and improving working performance project 2020
In recent years, to increase recycling rate of the end-of-life vehicle (ELV), some researches have b...
0 109 Development and verification on pollutants emission reduction during the automobile shredder residue (ASR) converted to energy process
This project uses evidence-based design to optimize resource recovery vehicles. By grasping the exis...
0 109 Innovation module for recycling collection vehicle application design research by evidence-based design method
0 109 109 North District Water Pollution Incident Emergency Response Joint Prevention Drill and Hsinchu City Marine Pollution Monitoring and Response Plan
For promoting the utilization and management of inorganic recycled materials (Secondary Materials), ...
0 109 Project on Environmental Application and Integration of Inorganic Recycling Materials
In response to the depletion of resources derived from the rapid economic development and the m...
0 109 Project of strategic planning and promoting inter-ministerial information interface for resource circulation
The project was executed from February 4th, 2020 to November 30st, 2020. Achievements made in this p...
0 109 The Project of Incinerator Fly Ash Reduction and Recycling Promotion in 2020
The items that were announced as recycling should be examined and reviewed to add the new items or c...
0 109 Work Plan of Project to Promote General Waste Recycling Management
The results of project implementation are summarized as following: In respect of unregistered conta...
0 109 Regulated Recyclable Containers of Responsible Enterprise and collection recycling system management project
The project has investigated the current situation of 9 domestic waste plastic recycling factories, ...
0 109 Product category rules for Recycled Waste plastic containers and verificated system Establishment
Due to the COVID-19 pandemic, many border restrictions remain in place and foreign experts and schol...
0 109 Project on International Collaboration for Innovation in the Circular Economy Industry
Construction waste is a kind of stable and harmless resource, and it’s also the main promotion item ...
0 109 Construction Waste Management Project
The objectives of this project are to evaluate the current status for the treatment and reuse of fiv...
0 109 Project on the Evaluation of Treatment and Reuse of Organic Waste
The objective of this project is to build up the leaching baseline for environmental application of ...
0 109 Environmental quality verification and supporting management plan for recycled inorganic aggregate
In order to strengthen the management of incinerating recycled aggregate, this project reviewed the ...
0 109 Inorganic Waste Resource Management and Environmental Use Planning Project
The project included five major work items, the following described each parts results of the work. ...
0 109 Evaluation on Industrial Waste Disposal Management, 2020
0 109 Application of Supervision Technology in Environmental Enforcement and Construction of Training Environment for Environmental Enforcement Personnel
The project period was from Mar 6, 2020 to Nov 30, 2020. The waste batteries collection campaign had...
0 109 Recycling Fee Rate Reviewing and Management Improving for the Collection and Recycling Systems of Waste Batteries and Waste Lamps
The project comprises six parts, including drafting programs for the remediation of contaminated pub...
0 109 2020 Improvement of Tracking Dumping Sites and Planning the Violation Potentials and Supervision
Owing to the high toxicity of mercury (Hg), the restriction of Hg-containing products in different c...
0 109 Elemental Mercury Adsorption and Recovery by Electrothermal Swing System with Gold Electrodeposited Activated Carbon Fiber Cloth
This project is the application study of converting carbon black from waste tire to pillar activated...
0 109 Technology for preparing cylindrical activated carbon from waste tire carbon black
The high nickel content layered material is currently the most commonly used positive electrode in l...
0 109 The project of recovery of lithium ion battery and its high value recycling
For the purpose of international data collection, this project tracked the follow-up changes in the ...
0 109 International Waste Transboundary Movement Management Adjustment Program
With the widespread use of lithium batteries in 3C, automotive and energy storage applications, and ...
0 109 Factory application and test of regenerated positive precursor materials for waste lithium battery
“Methods and Facilities Standards for the Storage, Clearance and Disposal of Industrial Waste” and “...
0 109 Project on Waste Treatment Technology and Hazardous Waste Identification
Based on “green fashion and circular trends” as the main theme, this plan promotes the key polic...
0 109 The Marketing and Education Promotion Plan for Circular Economy Source Reduction and Resource Recovery of Waste
This project was carried out from March 26th, 2020 to December 10th, 2020. The propose included curr...
0 109 Project of Management for Waste Clearance, Disposal and Recycled materials in 2019
The Environmental Protection Administration of the Executive Yuan commissioned the “General Waste In...
0 109 Project of General Waste Information Management System
This project was carried out from April 1st, 2020 to December 15th, 2020.Complete collect for genera...
0 109 Improving General Waste Reduction and Disposal Management Project.
In this project, we used hydrothermal method instead of traditional pyrolysis to transform rigid PU ...
0 109 Upgrade PU waste by hydrothermal carbonization to value-added products
There are around 100,000 tons of PET bottles consumed every year in Taiwan. Green shirt made of recy...
0 109 Development of sandwich-structured composite core foam material via upgrading recycled PET extrusion foaming process
For the recycling process of waste paper containers, except for an additional cleaning procedure bei...
0 109 Application Development of Nano Cellulose-based Functional Materials from Waste Paper Containers
One of the problems faced by the resource recycling industry in Taiwan over the years has been that ...
0 109 Application research on adding recycled materials to lables of packaging industry
Because of its durability and low air permeability, glass containers can effectively preserve the qu...
0 109 Process Verification Test for Autoclaved Lightweight Aerated Concrete Partition Walls with Recycled Glass
In order to improve the performance of the e-waste recycling scheme in Taiwan, this project finished...
0 109 The industry development and Cooperation Exchange of waste home appliances and IT equipment Recycling System
The main objective of this project was to strengthen supervision over various types of announcement ...
0 109 The Registration of Registered Persons, Taichung,2020
0 109 The Evaluation Plan for the Diversity Utilization of Changhua County Agricultural Wooden Materials (nursery stocks and fruit tree branches)
This project follows through the research results of agriculture, fishery and medical wastes managem...
0 109 Recycling and cleaning management project plans for agriculture, fishery and medical wastes
In order to improve the management of the recycling for the incineration bottom ash from incinerati...
0 109 Project of improving recycling management, supervision and inspection for the incineration fly ash and bottom ash
This project assisted the Environmental Protection Administration in promoting activities concerning...
0 109 Maintenance and Application of Industrial Waste Management Information System of 2020
The existing environmental protection departments’ management measures for the flow of industrial wa...
0 109 Strengthening the business waste cleaning plan, filling out the review and management mechanism and supporting tools to build plans
The objective of this project was to enhance waste recycling management. This project improved the d...
0 109 Improving Industrial Waste Recycling Management and Evaluation of Metal Resources Circulation Project.
The implementation period of this project is from April 22 to December 31, 2019. Relevant results in...
0 109 The planning and promoting project for packaging reduction and heavy metal source reduction 2019
  Each year about 6,000 tonnes of rigid polyurethane (PUR) was produced from the dismantling of wast...
0 109 Recycling of waste refrigerator PUR with improved compatibility for making new foam products
The key items executed in the program include “public toilet enhancement”, “environment improvement”...
0 109 109 Chiayi City Public Toilet Upgrade and Environmental Improvement and Waste Reduction and Recycling Work Plan
In this study, we cooperated with UWin Nanotech Co., Ltd. to recycle and refine the copper from the ...
0 109 Development of waste circuit board copper recycling, refining and nitrogen oxides reduction technologies
This project carried out from January 1st, 2020 to December 10th, 2020. The implementation results o...
0 109 Project of upgrading low carbon refuse trucks and promoting sanitation worker care , 2020
In Taiwan, some recycling enterprises have to deal with the sanitary problem to improve the impressi...
0 109 Counseling environmental management system of recycling regulated recyclable waste and process of waste container treatment plant plan
This project is aimed to reinforcing and materializing the management of varied kinds of industrial ...
0 109 The 2020-2021 Project to Review Both the Industrial Waste Flow Reporting Controls and the Industrial Waste Disposal Plans
The implementation period for this plan runs from April 21 to November 30, 2020, which is to mainly ...
0 109 2020,Promotion and Inspection on Resource Recycling in Yunlin
In order to continue the promotion of recycling tasks, Environmental Protection Agency of Chiayi Cit...
0 109 109 The project of recycling task in Chiayi city
This plan was implemented from March 6, 2020 to November 30, 2020. The main business includes assist...
0 109 2020 Resource Recycling Advocacy and Inspection Control Plan
Environmental Protection Bureau, Chiayi City (abbreviated as EPB in the following descriptions) init...
0 109 2020 Chiayi City resource recycling station operations and large-scale publicity project
The covalent cross-linking of tire rubbers is prerequisite for acquiring high elasticity and environ...
0 109 Plant trial of devulcanization and cyclic application of waste tire rubber using a twin-screw extruder
0 109 109 Annual Paper Tableware Recycling Friendly Store Subsidy Program of the Environmental Protection Bureau of Chiayi City Government
In this plan, we will use the associative analysis on high-risk air pollution data through heterogen...
0 109 Enforcing Environmental Laws and Technology Verification on High- Risk Air Pollution Affairs
本計畫依據環保局訂定之目標及工作內容,執行「宜蘭縣108年度促進垃圾減量回收及資源回收宣導計畫」,本計畫執行期程自108年1月1日至108年12月31日止,相關作業均詳實推動與執行,本計畫執行之成果如...
0 108 Yilan County's 108-year Promotion Plan for Promoting Waste Reduction and Resource Recovery
依據環保局訂定之目標及工作內容,執行「宜蘭縣108年度資源回收專案作業查核追蹤管制計畫」,相關作業均詳實推動與執行,截至期末報告階段,本計畫執行之成果重點說明如下: 一、辦理資源回收巡查工作 本計畫針...
0 108 Yilan County 108 annual resource recovery project operation review and tracking control plan
A. Refuse Incineration Plant Portion In order to ensure the effective supervision of the management ...
0 108 Project for Management and Appraisal Work of Refuse Incineration Plants and Public-owned Landfills
Now although 24 incineration plants still run well but their efficiencies are reducing gradually bec...
0 108 Project for Researching the Technical Guidelines for the Upgrad and Rebuild Stage of Refuse Incineration Plants
This project summarizes the cases of foreign circular economy parks, proposing the feasibility asses...
0 108 Waste circular economy promotion and parks developing plan in Taiwan
The project period was from Jan18, 2019 to Dec 31, 2019. The information of secondary Lithium batter...
0 108 Management and Tactics Proposing for the Collection and Recycling systems of Waste Batteries and Waste Lamps
The project period was from January 1, 2019 to December 31, 2020. The main objectives of the project...
0 108 The Inspection and Certification Third Party on Due Recycled Waste(waste batteries and waste lamps)
For the auditing and certification of waste lead batteries recycling facilities, the main tasks incl...
0 108 The Auditing and Certification Project of the Regulated Recyclable Waste (Waste Lead batteries)
The Resource Recycle E-paper is a bi-weekly report, which aims to achieve the purpose of promotion b...
0 108 The Biweekly of Resoyrce Recycle E-paper 20197&&2020
From January 1, 2019 to December 31, 2020, the totally certificated amount of waste electronic and e...
0 108 The Third-party Inspection and Certification on Waste Information Technology Appliances and Electrical and Electronic equipment
The project period was from Jan 01, 2019 to Dec 31, 2020. According to the results of auditing and c...
0 108 The Auditing and Certification Project of the Regulated Recyclable Waste (Non-Plastics Waste Containers)
The performed results of the Project conducted by FTIS during the project period, January 01, 2019 t...
0 108 The auditing and certification project of the regulated recyclable waste (Waste Vehicles)
The main aspect in this project was to assist the Environmental Protection Administration in the rev...
0 108 Improvement Plan on Management and Guidance for recycle and treatment business enterprises and subsidy management mechanism.
For the auditing and certification of waste tires recycling facilities, the main tasks included the ...
0 108 Project of Auditing & Certification Group on Regulated Recyclable Waste (Waste Tires)